GTH-C3 Hardware Getting Started Guides
Safety information, connector pinouts and a Declaration of R&TTE conformance. Every GTH-C3 system includes a hard copy of this document when delivered.
| 10-0013: E1/T1 Monitor 3.0 |
| 10-0014: SDH Monitor 3.0 |
| 10-0016: E1/T1 Messenger 3.0 |
GTH-C3 Hardware Certification and Regulatory Testing
GTH-C3 hardware has been tested by Intertek Testing (ETL-SEMKO).
These documents are available to our customers. If you want a password, contact matthias@corelatus.com.
Reports for GTH 3.0 and STH 3.0 hardware
| Standard | Document |
|---|---|
| IEC 62368-1 | Test Report (2024) |
| IEC 62368-1 | CB Certificate (2024) |
| UL 62368-1/CSA C22.2 62368-1 | Recognized Component Report (2024) |
| EN 300 386 | EMC Test Report (2011) GTH 3.0 STH 3.0 |
| FCC Part 15 | EMC Test Report (2011) GTH 3.0 STH 3.0 |
Documents for superseded hardware
Test reports for GTH 2.1 systems. GTH 2.1 was superseded by GTH 3.0 in 2014.
| Standard | Document |
|---|---|
| - | 10-0006: E1/T1 Messenger 2.1 Getting started |
| IEC/EN 60950-1 | Test Report (2011) |
| IEC/EN 60950-1 | CB Certificate (2013) |
| ANSI/UL 60950-1 CAN/CSA-C22.2 No. 60950-1 | Recognised Component Report (2013) |
| EN 300 386 | EMC Test Report (2006) |
| FCC Part 68 | Test Report (2006) |
| CS03 | ISDN Test Report (2006) |
Test reports for GTH 2.0 systems. GTH 2.0 was superseded by GTH 2.1 in 2008.
| IEC/EN 60950-1 Test Report |
| Recognized Component Report |
| CB Certificate |
Safety information and pin-outs for GTH 1.x and IEB 1.0 systems.
GTH 1.x and IEB 1.0 systems were superseded by GTH 2.0 in 2006.
| GTH 1.x/IEB 1.0 |
| CB Certificate for GTH 1.x(2004) |
| EMC Test Report for GTH 1.x |
| EN 60950 Electrical Safety Test Report for GTH 1.x |
| EN 60950 Verification of Conformity for GTH 1.x |